Panelized Load-Bearing Wall Systems in NY & NJ

Prefabricated cold-formed steel wall panels set by crane, plumbed, braced and tied to the floor system, one level at a time.

  • 20+ years of experience
  • Quality work
  • On schedule

Or call (973) 392-4979

Request a Bid

Instant confirmation, no spam. We only use your info to reply about your project.

  • Send drawings or call
  • Mon-Sat 7:00 AM-4:00 PM, Sunday closed

Panelized load-bearing walls move a lot of the framing work off the site. Wall panels are built in a shop, delivered in sequence and set by crane, which lets a mid-rise building climb one floor at a time on a steady cycle. We install panelized cold-formed steel wall systems for multifamily, mixed-use and hospitality buildings across New York and New Jersey.

The speed only shows up if the installation is clean. Panels have to land on layout, be plumbed and braced, and be tied to the floor system so the next level can start. That is the part we focus on: a predictable floor cycle the general contractor can build a schedule around.

Scope we install

  • Setting prefabricated load-bearing and shear wall panels by crane
  • Layout, plumbing and temporary bracing
  • Panel-to-panel and panel-to-floor connections per the shop drawings
  • Headers, straps and hold-downs as detailed
  • Coordination with the joist or composite floor package above
  • Infill framing between panels where included

From our jobsites

Real work, real crews

Panelized load-bearing steel walls laid out floor by floor
Panelized load-bearing steel walls laid out floor by floor
Multistory panelized steel framing with the Manhattan skyline beyond
Multistory panelized steel framing with the Manhattan skyline beyond
Crew installing panelized steel walls on a multifamily deck
Crew installing panelized steel walls on a multifamily deck

How it works

How we run the work

A short, predictable sequence the GC can plan around.

01

Floor layout

Wall lines are laid out on the deck from the panel drawings so every panel has a place to land.

02

Crane picks in sequence

Panels arrive in the order they go up and are picked straight from the truck when the site allows it.

03

Plumb, brace and connect

Each panel is plumbed, braced and connected to its neighbors and to the floor as the drawings specify.

04

Ready for the next floor

With walls connected, the floor system goes on top and the cycle repeats on the next level.

Holding a floor cycle

On a panelized job the schedule is really a repeating cycle: layout, walls, floor, next level. One slow floor pushes every trade above it. Our crews are organized to keep that cycle steady, with enough people on the deck on crane days so picks are not wasted.

Quality shows up in the walls being plumb and on line. That makes life easier for the drywall, window and facade trades later, and it avoids the rework that eats schedule at the end of a job.

Where this goes in

  • Four to nine story multifamily buildings
  • Hotels and student housing
  • Mixed-use buildings over a concrete or steel podium
  • Rooftop additions on existing structures
It is a cold-formed steel wall system where the load-bearing walls are built as panels in a shop, then delivered and set by crane. The panels carry the floors above, and the building goes up one level at a time. The panel supplier and the engineer of record design the system; our crews install it.
It depends on the building, the crane, deliveries and inspections. The advantage of panels is a repeatable floor cycle. We plan crew size and crane days with the GC so each floor follows the last without gaps.
Yes. We install bar joists, C-joists and composite floor systems such as Hambro, EcoSpan, ComSlab and Epicore, so we can take the walls and floors together when that is how the job is bought out.
Yes. Our crews have set panelized walls by crane on multifamily buildings in Hudson County, where street access and laydown are tight. We plan pick sequences and delivery timing with the GC before the first panel arrives.